Hub long lead
Top sales list hub long lead
Pakistan (All cities)
Reliable Durable Efficient Easy to use Fast Economical Special offer from online traders on daraz
Rs 400
See product
Pakistan
PHOENIX LEAD ACID BATTERY XP-145 Brand Phoenix Product Code XP-145 Availability In Stock Rs.9,800.00 2 or more Rs.9,700.00 Technical feature Extra long life service design Higher safety reliable construction Flexibility design for multiple installation More Capable, More Responsible, More Refined Easy to put in, Easy to take out, Easy to Carry Handles JIS standard International Recognition Manufactured on latest equipment under supervision of highly qualified and well trained engineers staff Quality tested in every step of production in most modern and well equipped lab Longs lasting performance in all weather conditions High performance plates and electrolyte to gain extra power output for common power backup system applications widely used in the field of UPS, Emergency lighting system. UNDER LICENCE OF KUKJE INDUSTRY BATTERY CO., LTD. KOREA, Six Months Free Replacement Warranty of Product Conditions Apply
Rs 9,80
See product
Lahore (Punjab)
About Power Safe Lead Acid Battery: The PowerSafe V Front Terminal range of valve regulated lead acid batteries has been designed specifically for use in applications that demands the highest levels of security. With compliance with the most strict international standards, PowerSafe Lead Acid Rechargeable batteries are recognized worldwide as a best solution for Telecom applications. The reputation of PowerSafe Front Terminal Lead Acid batteries for long service life, together with excellent high rate performance, also makes it ideal for high integrity, high specification UPS systems. Some highlighted Features: 1. Front terminal connections for fast and easy installation and maintenance 2. Suitable for 19″, 23″ and ETSI racking 3. High energy density 4. Fast charge acceptance capability 5. High reliability 6. Excellent long service life 7. Up to 2 year shelf life All lead acid batteries comes with warranty. Leas acid batteries are of tax free. Great working with home and office ups environment. Feel free to call during business hours: 11am-11pm
Rs 19.500
See product
Lahore (Punjab)
Why NorthStar battery? A safe, reliable, high-performance sealed lead acid battery for telecom applications. Delivers long life for reliable and unreliable grid conditions. Technical Details:- Chemistry: Sealed Lead Acid Voltage: 12 Nominal Capacity: 100Ah Dimensions in Inches (L x W x H): 15.6 x 4.2 x 11.3 Terminals: M8 Insert Weight (lbs): 72 Warranty: 1 Year Condition: Brand New Product Code: NSB100FT Battery Features:- • Pure lead electrochemistry greatly increases temp and corrosion resistance, while reducing component aging • Thin plates deliver large surface area, high power density and low resistance • Design life 15+ years at 20°C (68°F) • EUROBAT design life definition: Very Long Life (12+ years) • Fast recharging • Operating temperature range -40°C to +65°C (-40°F to 149°F) • State-of-the-art automated manufacturing ensures consistency and reliability • Shelf life of up to 24 months • Advanced 3 stage terminal design to ensure leak-free operation – brass terminals provide maximum performance • High modulus Polyphenylene Oxide (PPO) plastic materials designed to withstand extended elevated operating temperatures and maintain high battery compression essential for reliable operation • Non-halogenated, thermally sealed plastic casing • Flame retardant (UL 94 VO) and LOI of at least 28%
See product
Pakistan (All cities)
UGreen 5 in 1 Type-C Multiple Ports Hub price in Pakistan UGREEN USB C HUb 5 in1 with 4K HDMI, High Speed Internet, USB A Ports, 100W PD Charging Passthrough devices into five ports for data transfer, display expansion, internet connection, and charging. Use the Ethernet port to maintain fast and a more stable wired network connection speeds up to 1 Gbps. 5-in-1 USB C Hub:This 5-in-1 USB-C Hub turns a single USB-C port of your USB-C devices into five ports for data transfer, display expansion, internet connection, and charging. Use the Ethernet port to maintain fast and a more stable wired network connection speeds up to 1 Gbps. Fast and Convenient Charging:When using all functions of the USB C dongle, the 100W USB C PD charging port can fully charge your device which compatible with MacBook Pro 2016/2017/2018/2019, MacBook Air 2018/2019/2020, Surface GO, Google PixelBook and more.(Note: The USB-C port only supports charging and does not support data transmission) 4K Ultra HD Video:The HDMI connection output resolution of this USB C ethernet hub is up to [email protected] You can enjoy lively Ultra HD video streaming with this USB C hub multiport adapter. Fast Data Transfer:You can connect a (wireless or wire) mouse, keyboard, hard drive, USB flash disk and more devices, and all ports can be used at the same time. The 2*USB 3. 0 ports transfer movies, music and files at up to 5Gbps, which is 10 times faster than USB 2. 0. Mac-style Design: Anodized aluminum Alloy casing with Ionized Finish. EMI Protection prevents interference with wireless devices. The UGREEN USB-C hub can save desk space and expand your devices connectivity. UGREEN 5-in-1 USB C Hub with Ethernet and HDMI -Wired Gigabit Ethernet could definitely ensure a stable connection and max speed up to 1000Mbps. -Video and audio output through HDMI port with resolution up to 3840 x 2160 at 30Hz. -Two USB 3.0 Type-A ports with data transfer speed up to 5 Gbp/s. -Used with no external drivers or power required. -Unibody aluminum alloy housing. -Hidden LED Indicator. Compatible Devices Include: MacBook Pro (2015 / 2016 / 2017 / 2018/2019/2020/m1) MacBook Air (2015 / 2016 / 2017 / 2018/2019/2020/m1) iPad Pro (2020 / 2019 / 2018) Pixelbook (2019 / 2018 / 2017) XPS (13 inch / 15 inch) ThinkPad X1 Spectre Folio SF314 Supported Systems: Windows 10, 8, 7, Vista, XP, Mac OS X 10.6 or later, Linux 2.6.14 or Later Please Note: The USB-C port only supports charging, but does not support data transmission. 2.4 GHz wireless devices, MIDI devices and some USB 3.0 devices may not be supported. The extended cable is 0.5 ft long. Widely compatible MacBook / MacBook Pro (2020 /m1/ 2019 / 2018 / 2017) MacBook Air (2020 /m1/ 2019 / 2018) iPad Pro (2020 / 2019 / 2018) XPS (13 inch / 15 inch) Pixelbook (2019 / 2018 / 2017) 5-in-1 USB C Hub Five expansion interfaces to meet your work needs. Easy to Carry Around Keep your hub’s ports protected from dust and scratches with the included protective travel pouch.
See product
Pakistan (All cities)
Anker Premium 4-in-1 USB C Hub Adapter - Gray with Official Warranty Description Premium 4-in-1 USB-C Hub The USB-C and USB-A Connectivity Station Four-in-One Sync data from a thumb drive, plug in USB peripherals, and charge a MacBook at full speed—all from the same hub. Speedy Sync Access 5 Gbps data transfer speeds, letting you transfer movies, music, and an entire vacation's worth of photos in seconds. Power, Delivered USB-C Power Delivery supports uninterrupted pass-through charging. Get more done while charging your MacBook, and shatter the limitations of having a single USB-C port. Worry-Free Warranty At Anker, we believe in our products. That's why we back them all with an 18-month warranty and provide friendly, easy-to-reach support. Compatible Devices: Apple MacBook (2015 / 2016 / 2017 / 2018) Apple MacBook Pro (2015 / 2016 / 2017 / 2018) Apple iMac / iMac Pro (21.5 inch, 27 inch) Google ChromeBook Pixel (2016 / 2017) Note: Connect to AC power by using a USB charger (not included). We recommend using a 60W PD (Power Delivery) charger: 45W for charging the connected laptop and 15W for powering the hub. The 1.5A USB charging port is indicated by the battery icon next to it. The other two USB ports are intended for data transfer and connecting peripherals.They only provide a minimal 0.9A charging output. The extended cable is 0.6 ft long. Not compatible with Dell XPS 13's original stock adapter. Use a 60W adapter to charge while connected to the hub.
Rs 5.460
See product
Pakistan (All cities)
Anker Premium 4-in-1 USB C Hub Adapter - Gray with Official Warranty Description b'/xc2/xa0'Premium 4-in-1 USB-C Hub The USB-C and USB-A Connectivity Station Four-in-One Sync data from a thumb drive, plug-in USB peripherals, and charge a MacBook at full speedb'/xe2/x80/x94'all from the same hub. Speedy Sync Access 5 Gbps data transfer speeds, letting you transfer movies, music, and an entire vacation's worth of photos in seconds. Power, Delivered USB-C Power Delivery supports uninterrupted pass-through charging. Get more done while charging your MacBook, and shatter the limitations of having a single USB-C port. Worry-Free Warranty At Anker, we believe in our products. That's why we back them all with an 18-month warranty and provide friendly, easy-to-reach support. Compatible Devices: Apple MacBook (2015 / 2016 / 2017 / 2018)b'/xc2/xa0' Apple MacBook Pro (2015 / 2016 / 2017 / 2018)b'/xc2/xa0' Apple iMac / iMac Pro (21.5 inch, 27 inch)b'/xc2/xa0' Google ChromeBook Pixel (2016 / 2017) Note: Connect to AC power by using a USB charger (not included). We recommend using a 60W PD (Power Delivery) charger: 45W for charging the connected laptop and 15W for powering the hub. The 1.5A USB charging port is indicated by the battery icon next to it. The other two USB ports are intended for data transfer and connecting peripherals. They only provide a minimal 0.9A charging output. The extended cable is 0.6 ft long.b'/xc2/xa0' Not compatible with Dell XPS 13's original stock adapter. Use a 60W adapter to charge while connected to the hub. b'/xc2/xa0' BEST RATES IN TOWN WITH FREE DELIVERY: Our reputed online platform offers the best deals and offers available from time to time. We also have a vast range of discounted products. At Shopon.pk, we ensure that customers are satisfied, and after buying from us, you will always come back to us for further shopping. In the coming future, we expect to introduce even better, newer, and innovative products, so that you keep on shopping from us.b'/xc2/xa0'b'/xc2/xa0' b'/xc2/xa0' BUY THE LATEST ACCESSORIES ONLINE FROM SHOPON.PK AT BEST & CHEAP PRICE: b'/xc2/xa0'Shopon.pk offers a wide range of computer accessories at the best price. You can get your order, sitting anywhere in Pakistan, whether it is Lahore, Karachi, Islamabad, or Faisalabad; in fact, all across Pakistan. We mainly have a vast range of IT-related computer accessories suitable for people of all age groups and meant to cater to different purposes. Shopon.pk provides you access to the best and most cost-effective computer accessories in town. From here, you can get all the newly launched computer accessories on the market.
Rs 5.460
See product
Lahore (Punjab)
About Power Safe The PowerSafe V Front Terminal range of valve regulated lead acid batteries has been designed specifically for use in applications that demands the highest levels of security. With compliance with the most strict international standards, PowerSafe Lead Acid Rechargeable batteries are recognized worldwide as a best solution for Telecom applications. The reputation of PowerSafe Front Terminal Lead Acid batteries for long service life, together with excellent high rate performance, also makes it ideal for high integrity, high specification UPS systems. Some highlighted Features 1. Front terminal connections for fast and easy installation and maintenance 2. High energy density 3. Fast charge acceptance capability 4. High...
Rs 19.500
See product
Pakistan (All cities)
USB3.0 ultra-high speed transmission rate, transfer rate up to 5Gbps per second. Backward compatible with USB2.0, USB1.1 Support hub and peripheral devices Plug and Play and Hot Plug function 4 Port current overload detection and protection function design Built-in LED indicator can display USB power supply, DC power supply Transmission rate: 5Gbps Connection interface: USB 3.0 x 4 USB cable length: 1M
Rs 514
See product
Pakistan
PHOENIX LEAD ACID BATTERY UGS-175 Brand Phoenix Product Code UGS-175 Availability In Stock Rs.11,500.00 2 or more Rs.11,400.00 Six Months Free Replacement Warranty of Product Conditions Apply Technical feature Extra long life service design Higher safety reliable construction Flexibility design for multiple installation More Capable, More Responsible, More Refined Easy to put in, Easy to take out, Easy to Carry Handles JIS standard International Recognition Manufactured on latest equipment under supervision of highly qualified and well trained engineers staff Quality tested in every step of production in most modern and well equipped lab Longs lasting performance in all weather conditions High performance plates and electrolyte to gain extra power output for common power backup system applications widely used in the field of UPS, Emergency lighting system. UNDER LICENCE OF KUKJE INDUSTRY BATTERY CO., LTD. KOREA,
Rs 11,5
See product
Lahore (Punjab)
Technical Details: Chemistry: Sealed Lead Acid Voltage: 12 volts Nominal Capacity: 170.0Ah Terminals: M6 (Front Terminals) Dimensions (L x W x H): 22.10 x 4.90 x 12.40 Weight (pounds): 148 About PowerSafe Battery: EnerSyS PowerSafe 12V170F Front Terminal batteries have been designed specifically for use in applications which demand the highest levels of security and reliability. With proven compliance to the most rigorous international standards, PowerSafe V is recognized worldwide as the premium battery for Telecom applications. PowerSafe Vs reputation for long service life, together with excellent high rate performance, also makes it the number one choice for high integrity, high specification UPS systems. PowerSafe 12V170F Features and Benefits: • Front terminal connections for fast and easy installation and maintenance. • Suitable for 19″, 23″ and ETSI racking. • UL94 V-0 flame retardant container and cover. • High reliability. • Proven long service life.
See product
Pakistan
Powerful designed, Micro AC-DC UPS 1. Wide AC input range from 90 to 300VAC. It can avoid the AC peak voltage when AC is recoverd. 2. DC output design, transfer time from AC failed to battery mode is only 4ms. High efficiency support from battery power to DC output. 3. Max. 50W output, the range can be designed from 5~50VDC setup by manufacture before delivery. Most of output voltages are 48V, 24V, 12V, 9V, 7.5V and 5V. 4. The end user can decide the battery capacity depends on backup time they need. Micro AC-DC UPS can work with most of popular 12VDC Lead Acid Maintenance free battery cell. The capacity from 1.2Ah to 20Ah are supported. Our Individual charger can support 1000mA charging current. So, we suggest list the largest battery cell is 20Ah. The Lead Acid battery cell is the most popular battery in the world, therefore, end user can easily to find replace battery in the local market and no after service cost, too. We also suggest importer can import Micro AC-DC UPS without battery, to save freight cost and import tax of battery. 5. Reversed polarity protection, to avoid the end user connected wrong polarity to damaged Micro AC-DC UPS. Our design the battery cell is external connection, the benefits are : 1. Save the freight cost for importer, because only need to import the Micro AC-DC UPS Main Body. 2. Importer can use the most of popular lead acid maintenance free battery from local vendor. No need to pay battery import tax. 3. And, to work with the wide range battery cell from 12V/1.2Ah to 12V/20Ah supported for different backup time. 4. The end user can easily to do after service for battery. If you have any idea, please feel free to let me know! Best regards, Jeff Chiu / Sales Manager Powertron Plus Electronics Corp. http:www.pplus.com.tw E-mail : chiu0412@seed.net.tw
See product
Islamabad (Islamabad Capital Territory)
Sealed Lead Battery (12 v, 7.2 Ah) CSB Sealed Lead Battery CSB Battery Co., Limited, Made in Taiwan No. GP F2 & 12 V 7.2 Ah Weight 2.5 kg & length at least 8 inches and choraie 5 inches, Price /- L E D Bulb (12 volt) 12 volt Cool, bright & full heat sing Specially for load shedding Original pictures attached Durable for long life and easily repairable Price 500/-, i am living in Rwp.
Rs 2.000
See product
Pakistan
SOLUTIONS INN lhr PHOENIX LEAD ACID BATTERY UGS-175 Brand Phoenix Product Code UGS-175 Availability In Stock Rs.11,500.00 2 or more Rs.11,400.00 Technical feature Extra long life service design Higher safety reliable construction Flexibility design for multiple installation More Capable, More Responsible, More Refined Easy to put in, Easy to take out, Easy to Carry Handles JIS standard International Recognition Manufactured on latest equipment under supervision of highly qualified and well trained engineers staff Quality tested in every step of production in most modern and well equipped lab Longs lasting performance in all weather conditions High performance plates and electrolyte to gain extra power output for common power backup system applications widely used in the field of UPS, Emergency lighting system. UNDER LICENCE OF KUKJE INDUSTRY BATTERY CO., LTD. KOREA, Six Months Free Replacement Warranty of Product Conditions Apply
Rs 11,5
See product
Pakistan
Pls contact for booking .. Tel: +447418462429 , Tel: +447087620837 Whatsapp #:+447418462429 Email :scrapbussinessonline@hotmail.com Skype ID : metalscrap111 We are specialized in the sales of full metal scrap such as ac/fridge compressor cpu ceramic gold scrap H.M.S 1&2, Copper wire scrap Drained Battery Lead scrap in the UK (LONDON).We have all our product fully ready for sales in good quantity and quality also to be shipped out for our buyers. MINIMUM ORDER : 50 MT AVAILABLE QUANTITY : 900 MT SERIOUS BUYERS ONLY.... Create a long time business relation with us &save lot more. Unparalled after sales services guaranteed!!!Come partner with us !!!!
Rs 21.000
See product
-
Next →